Altius coordinates the loading of 3 turbines, 3 generators and auxiliary equipment up to 90 tons and 4.52 m high in Antwerp (Belgium) to Zarate (Argentina), managing the loading on MAFIS, lashing and subsequent loading to vessel.
The successful operation was the result of collaboration between the Madrid and Buenos Aires offices.