Skip to main content

First shipment of the project “ILO NODO SUR – NEPI PROJECT

By 18 de September de 2015August 6th, 2023News, Projects

Last September 8, Altius successfully completed in the port of Charleston (USA) the loading operation belonging to the first shipment of the “ILO South Node – Nepi Project”, loading a Gas Turbine of 199.5 Tons of weight and a Generator of 256.4 Tons of weight.

This shipment was completed a few days ago with a second call at the Port of Houston to load auxiliary accessories and IMO materials aboard a vessel with means and transport them to the Port of Ilo in Peru.

IMG_6158
IMG_6148