Unloading and transfer to second machinery area, on board the MV IWAMI, about 26 bx/140 tons.
Carried out with the ship’s own means, ¨forklift¨ on board and a 100 ton crane on land to move it to the second zone.
The operation was successfully completed in about 4 hours.