Skip to main content

Transport with precision: 1,300-ton STS crane for Termavi

By 27 de May de 2025News, Projects

We share with you the video of the complex and successful transport we carried out for Termavi: the transfer of a 1,300 ton STS Super-Post-Panamax crane from the Port of Tarragona to the Port of Vigo.

This turnkey project included structural reinforcements, RO-RO operations with 84 SPMT shafts, marine transportation aboard the MV Zhong Ren 121 and complete supervision in all phases of the operation.

Key maneuvers included turning the crane 90 degrees to optimize loading and pre-assembling the lashing system to minimize time on deck. Despite the total load reaching 1,900 tons, all operations were carried out safely and smoothly.

We invite you to watch the video and see the highlights of this extraordinary project.