Last September 8, Altius successfully completed in the port of Charleston (USA) the loading operation belonging to the first shipment of the “ILO South Node – Nepi Project”, loading a Gas Turbine of 199.5 Tons of weight and a Generator of 256.4 Tons of weight.
This shipment was completed a few days ago with a second call at the Port of Houston to load auxiliary accessories and IMO materials aboard a vessel with means and transport them to the Port of Ilo in Peru.