![](https://grupoaltius.com/wp-content/uploads/2017/10/embarque-altius-desde-gijon-espana-a-novorossiysk-rusia.jpg)
Shipment carried out by Altius Bilbao projects, from Gijón to Novorossiysk. It was loaded on September 2 in Gijon and unloaded on September 16-17 in Novorossiysk.
The cargo consisted of two pieces (a 201-ton Product Stripper and a 492-ton Fractionator), which traveled on deck, stowed properly and securely.